| Peer-Reviewed

Mechanism of Transfer Story Beam-column in High-rise Buildings

Received: 15 October 2021    Accepted: 5 November 2021    Published: 12 November 2021
Views:       Downloads:
Abstract

The structural layout of the transfer floor is easy to cause the discontinuity of vertical components, Sudden change of floor lateral stiffness and floor shear capacity, they were unfavorable to the calculation of the overall index of the structure. In order to study the working mechanism of single span transfer beam on the first floor of high-rise building structure with or without interaction with wall, the mechanism of the beam and column was analyzed in the transfer layer of high-rise buildings, and the calculation methods of sectional moment for inertia beam and wall by using the calculation method of bending stiffness was put forward. A simple method for calculating the according to the different arrangement of the shear wall on the single-span transfer beam was deduced, the combined action of the transfer beam-shear wall and the non-combined action of the transfer beam-shear wall has been analyzed and calculated. The results show that, when the full span of the shear wall is arranged on the transfer beam and the deformation coordination is considered, the following conclusions are verified: the flexural rigidity of the transfer beam is suitable for the joint action of the beam and the shear wall of the upper layer ( 5 times amplification); Under the "arching effect", the transfer beam and the upper shear wall transform the vertical force into the horizontal support thrust, which increases the shear force of the frame pillar. It should be considered in the design. It can be used as a reference for engineering construction and design colleagues.

Published in Science Discovery (Volume 9, Issue 6)
DOI 10.11648/j.sd.20210906.17
Page(s) 314-320
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2021. Published by Science Publishing Group

Keywords

Transfer Story, Sectional Moment of Inertia of Beam and Wall, Deformation Coordination, Arching Effect

References
[1] JGJ3-2010高层建筑混凝土结构技术规程:[S].北京:中国建筑工业出版社,2010。
[2] GB50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010。
[3] 崔鸿超.日本超高层建筑结构抗震新技术的发展现状及思考[J].建筑结构.2013,43(16):1-7。
[4] 魏琏,王森,韦承基.高层建筑转换梁结构类型及计算方法的研究[J].建筑结构,2001,(11):7-14。
[5] 赵明华,陈大兴,刘猛,欧强.考虑土拱效应影响的路堤荷载下土工格室加筋体变形分析[J].岩土工程学报,2020,42(04):601-609。
[6] 杨建民,司航.考虑土拱效应的圆形抗滑桩滑坡推力的计算[J].工业建筑,2016,46(01):105-110。
[7] 黄慎江,刘海龙.等效侧向刚度比和转换层位置对梁式转换框支剪力墙抗震性能的影响[J].工程抗震与加固改造,2016,38(01):15-20。
[8] 徐培福,王翠坤,郝锐坤,肖从真.转换层设置高度对框支剪力墙结构抗震性能的影响[J].建筑结,2000(01):38-42+29。
[9] 傅学怡.带转换层高层建筑结构设计建议[J].建筑结构学报,1999(02):28-42。
[10] 王啸楠,官俊良.转换梁刚度对基础隔震框架-剪力墙结构受力性能的影响[J].建筑结构,2019,49(S2):410-414。
[11] 曹胜涛,杨志勇,乔保娟,李志山.考虑剪力墙连梁刚度折减的设计模型研究[J].建筑结构,2019,49(13):79-85。
[12] 阳洋,蒋明真,王立磊,项超.考虑粗糙度影响间接测量梁刚度的损伤识别方法参数研究[J].建筑结构学报,2019,40(06):147-154+174。
[13] 郝安民.连梁刚度对框支剪力墙结构抗震性能的影响[J].建筑结构,2016,46(S2):282-285。
[14] 简斌,李东泽,林元,刘郁.一级抗震预应力型钢混凝土空腹桁架转换层框架结构三道防线抗震设防设计方法[J].建筑结构学报,2021,42(01):57-66。
[15] 祖萍萍,孙广俊,李鸿晶.混凝土梁式托柱转换层结构抗震性能分析[J].防灾减灾工程学报,2016,36(02):247-252+273。
[16] 巩玉发,陈新,张涛.梁式转换层结构设计方案抗震性能对比分析[J].工业建筑,2013,43(S1):285-288。
[17] 杨仁孟,陈兆荣,王森,魏琏.高层建筑结构在竖向荷载作用下楼板面内应力分析和工程实例[J].建筑结构,2017,47(01): 17-22。
Cite This Article
  • APA Style

    Chen Zhaorong, Cai Zhili, Bai Zhongkui, Zhao Zhen. (2021). Mechanism of Transfer Story Beam-column in High-rise Buildings. Science Discovery, 9(6), 314-320. https://doi.org/10.11648/j.sd.20210906.17

    Copy | Download

    ACS Style

    Chen Zhaorong; Cai Zhili; Bai Zhongkui; Zhao Zhen. Mechanism of Transfer Story Beam-column in High-rise Buildings. Sci. Discov. 2021, 9(6), 314-320. doi: 10.11648/j.sd.20210906.17

    Copy | Download

    AMA Style

    Chen Zhaorong, Cai Zhili, Bai Zhongkui, Zhao Zhen. Mechanism of Transfer Story Beam-column in High-rise Buildings. Sci Discov. 2021;9(6):314-320. doi: 10.11648/j.sd.20210906.17

    Copy | Download

  • @article{10.11648/j.sd.20210906.17,
      author = {Chen Zhaorong and Cai Zhili and Bai Zhongkui and Zhao Zhen},
      title = {Mechanism of Transfer Story Beam-column in High-rise Buildings},
      journal = {Science Discovery},
      volume = {9},
      number = {6},
      pages = {314-320},
      doi = {10.11648/j.sd.20210906.17},
      url = {https://doi.org/10.11648/j.sd.20210906.17},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.sd.20210906.17},
      abstract = {The structural layout of the transfer floor is easy to cause the discontinuity of vertical components, Sudden change of floor lateral stiffness and floor shear capacity, they were unfavorable to the calculation of the overall index of the structure. In order to study the working mechanism of single span transfer beam on the first floor of high-rise building structure with or without interaction with wall, the mechanism of the beam and column was analyzed in the transfer layer of high-rise buildings, and the calculation methods of sectional moment for inertia beam and wall by using the calculation method of bending stiffness was put forward. A simple method for calculating the according to the different arrangement of the shear wall on the single-span transfer beam was deduced, the combined action of the transfer beam-shear wall and the non-combined action of the transfer beam-shear wall has been analyzed and calculated. The results show that, when the full span of the shear wall is arranged on the transfer beam and the deformation coordination is considered, the following conclusions are verified: the flexural rigidity of the transfer beam is suitable for the joint action of the beam and the shear wall of the upper layer ( 5 times amplification); Under the "arching effect", the transfer beam and the upper shear wall transform the vertical force into the horizontal support thrust, which increases the shear force of the frame pillar. It should be considered in the design. It can be used as a reference for engineering construction and design colleagues.},
     year = {2021}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Mechanism of Transfer Story Beam-column in High-rise Buildings
    AU  - Chen Zhaorong
    AU  - Cai Zhili
    AU  - Bai Zhongkui
    AU  - Zhao Zhen
    Y1  - 2021/11/12
    PY  - 2021
    N1  - https://doi.org/10.11648/j.sd.20210906.17
    DO  - 10.11648/j.sd.20210906.17
    T2  - Science Discovery
    JF  - Science Discovery
    JO  - Science Discovery
    SP  - 314
    EP  - 320
    PB  - Science Publishing Group
    SN  - 2331-0650
    UR  - https://doi.org/10.11648/j.sd.20210906.17
    AB  - The structural layout of the transfer floor is easy to cause the discontinuity of vertical components, Sudden change of floor lateral stiffness and floor shear capacity, they were unfavorable to the calculation of the overall index of the structure. In order to study the working mechanism of single span transfer beam on the first floor of high-rise building structure with or without interaction with wall, the mechanism of the beam and column was analyzed in the transfer layer of high-rise buildings, and the calculation methods of sectional moment for inertia beam and wall by using the calculation method of bending stiffness was put forward. A simple method for calculating the according to the different arrangement of the shear wall on the single-span transfer beam was deduced, the combined action of the transfer beam-shear wall and the non-combined action of the transfer beam-shear wall has been analyzed and calculated. The results show that, when the full span of the shear wall is arranged on the transfer beam and the deformation coordination is considered, the following conclusions are verified: the flexural rigidity of the transfer beam is suitable for the joint action of the beam and the shear wall of the upper layer ( 5 times amplification); Under the "arching effect", the transfer beam and the upper shear wall transform the vertical force into the horizontal support thrust, which increases the shear force of the frame pillar. It should be considered in the design. It can be used as a reference for engineering construction and design colleagues.
    VL  - 9
    IS  - 6
    ER  - 

    Copy | Download

Author Information
  • China Construction Fifth Engineering Bureau the Third Construction Co., Ltd. Changsha, China

  • China Construction Fifth Engineering Bureau the Third Construction Co., Ltd. Changsha, China

  • China Construction Fifth Engineering Bureau the Third Construction Co., Ltd. Changsha, China

  • China Construction Fifth Engineering Bureau the Third Construction Co., Ltd. Changsha, China

  • Sections